Sonnet 4.6 versus Opus 4.6: compare task outcomes before averaging the verdict
Follow the simulator and SaaS results separately, then inspect the recorded cost and token analysis.
Video in English
Watch on YouTube ↗Define the work and the evidence for success
The 18 February 2026 description reports a roughly 15-minute comparison of Sonnet 4.6 and Opus 4.6 on production code. The chapter list names a SaaS and flight simulator. A working game, a useful landing page and a cheaper run are different outcomes, so keep separate notes for each rather than reducing the test to one score.
- Start with the price discussion at 0:00 and task overview at 0:40, recording the source’s claims before accepting them.
- Keep the same starting files and intended outcome identifiable for both model attempts.
- Define what you will actually test in each output, including the core interaction and the visitor’s main task.
Preserve the failure alongside the redesign result
The coding comparison begins at 2:46. The chapter at 5:40 explicitly says Opus works and Sonnet fails, while the later redesign reveal at 9:46 and winner chapter at 13:12 favour Sonnet overall. These statements can coexist because different tasks reveal different strengths. Do not erase the failed attempt when evaluating the later visual result.
- Watch the actual failure and note what action or state prevented completion, without assuming a later page redesign fixed it.
- Compare the landing-page versions at 11:00, checking information hierarchy and the real visitor journey as well as appearance.
- Record follow-up work and unresolved defects beside each model’s accepted output.
Interpret the token and price figures as a dated example
The description claims one model produced the better redesign using 30% fewer tokens while being 50% cheaper. Cost and token analysis appears at 14:01, followed by closing thoughts at 15:10. The source does not provide the complete usage ledger in its description, and this companion does not independently reproduce the percentages.
- Review the recorded analysis for which task and usage measures the figures describe.
- Separate token count, billed cost and elapsed time when comparing your own runs.
- Include retries and checks needed to reach a usable result, and verify present model pricing separately before planning a budget.
The takeaway
A model can win a redesign and lose another task. Retain that detail when choosing the next model, rather than treating a cheaper historical run as universal superiority.
About this article and its sources
Prepared 2 November 2026 from this exact published description and chapters. The recording was not independently watched or transcribed and no fresh hands-on test was performed. Steps are editorial adaptations; current setup, availability and offer terms may differ.
